In recent years, with the continuously implemented of the   large-scale urban development construction , the processing of construction waste has become a development difficult issues need to be resolved in the process of construction and urban management. The growing number of proper disposal of construction waste has become a pressing issue, landfill, piled up and so is not a good approach, comprehensive utilization is the right way. We all know that according to the feeding and nesting size, the crushing operations are often divided into coarse crushing, medium crushing and crushing. The commonly used equipments are impact breaker, compound crusher, single stage hammer crusher, vertical crusher, gyratory crusher, roll crusher machines, double roll crusher, combo crusher, and so on.
Reinforced concrete construction waste was subjected to sorting, peeling, or crushed, are reuse, construction waste recycling following: 
(1) after the construction waste crushing equipment processing , the muck can be used in road construction, pile filler; coarse and fine aggregate by the addition of a curing class material, can also be used for road pavement base
(2) the coarse and fine aggregate in the concrete construction waste and the remaining debris through the construction waste crushing equipment after treatment, they can all be used in the production of the corresponding strength grade concrete, mortar or brick, block, wall panels, floor tiles and other building materials preparation such as renewable products .
(3) for waste timber construction waste, not obviously damaged wood can be directly re-used for reconstruction of buildings, badly damaged wooden components can be used as the raw material of wood recycled sheet or paper.
(4) according to the appropriate proportion ,waste Asphalt Mixture directly used to recycle the asphalt concrete.
(5) construction waste includes waste steel, waste rebar and other scrap metal material by the construction waste disposal equipment stripping direct reuse or melted down processing.
(6) waste brick construction waste is burned clay-like materials, construction waste crushing equipment broken ground into powder materials can be used as concrete admixture substitute fly ash, slag powder, powder.
The recycling products after processed by the building waste process equipment can be used for the  green earth, building brick, muck fill foundation various channels utilize in order to achieve real construction waste and waste to treasure.
The construction waste crushing station our company produced is  determined to do the construction waste classification, and  fundamentally improve the resource utilization of construction waste. Under the strong support of government, our company gradually develops forward, and make our own contribution  to the building waste recycling resource ulitization of our country.
 VSI sand maker : http://www.china-crusher.com/sand-maker3.html
Ball mill : http://www.hxjqcrusher.com/Ball-mill.html